Company Name Boiler Type Project Images Peak shaving project of Xingan League Thermal Power Plant in Inner Mongolia Power plant installed capacity: 2 x 350MW Main equipment: High-pressure electrode thermal boilers: 6 units, 40MW eac...
| Company Name | Boiler Type | Project Images |
| Peak shaving project of Xingan League Thermal Power Plant in Inner Mongolia |
Power plant installed capacity: 2 x 350MW Main equipment: High-pressure electrode thermal boilers: 6 units, 40MW each; Atmospheric pressure thermal storage tanks: 10,000m³ |
![]() |
| Ningxia Electric Power Investment Xixia Thermal Power Plant Peak Shaving Project |
Power plant installed capacity: 1100MW Main equipment High-voltage electrode thermal boilers: 5 units, 40MW each; Atmospheric pressure thermal storage tanks: 10,000m³ |
![]() |
| Huadian Karamay Thermal Power Peak Shaving and Heating Project |
Power plant installed capacity: 2 x 350MW Main equipment High-voltage electrode thermal boilers: 6 units, 50MW each |
![]() |
| State Power Investment Corporation Liaoning Fushun Dongfang Thermal Power Project |
Power plant installed capacity: 2 x 350MW Main equipment High-pressure electrode thermal boilers: 2 units, 40MW each Atmospheric pressure thermal storage tanks: 1,000m³ |
![]() |
| Yunnan Tongwei Baoshan Polysilicon Steam Supply Project |
Type: Chemical Plant Main Equipment High-Pressure Electrode Steam Boiler: 2 units, 40MW Steam Temperature: 200℃ Steam Pressure: 1.4 MPa |
![]() |
| Heating Project for Teaching Buildings and Dormitories of Hebei Agricultural University |
Project Type: School Heating Heating Area (East Campus): 496,000 m² Heating Area (West Campus): 500,000 m² Main Equipment for East Campus High-Pressure Electrode Thermal Boilers: 12MW (3 units) Heat Storage (Cold) Tanks: 250m³ (16 units) Main Equipment for West Campus High-Pressure Electrode Thermal Boilers: 12MW (3 units) Heat Storage (Cold) Tanks: 250m³ (15 units) |
![]() |
| AstraZeneca, a Swedish pharmaceutical company, has a project in Sweden. |
Main Equipment High-voltage electrode steam boiler: 25MW, 1 unit Transmission voltage: 10kVSteam pressure: 3.2 MPa Commissioning date: 1990 |
![]() |
| Three-phase nuclear power plant auxiliary steam boiler project |
Main Equipment: High-voltage electrode steam boilers: 2 units, 31MW Steam temperature: 201.4℃ Steam pressure: 1.6 MPa |
![]() |